Check out these projects too
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and installation of a bridge structure above a moving can conveyor line.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Project documentation of a renovation, with a before and after view of the building.
- Stainless steel piping installed for product transport.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Modification and optimization of existing stainless steel pipes.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of automatic valves that open and close during the filling process.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a stainless steel fitting, made fully food-safe.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Construction of a platform to support a heat curtain and drying unit.