Check out these projects too
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Realization of a platform that was suspended from an existing structure.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design and production of custom-made stainless steel dump hoppers.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of a complex cluster of stainless steel tube connections.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Stainless steel piping installed for product transport.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Execution of floor works in which the floor was adjusted and extended from below.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of internal walls to create separate office spaces.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of stainless steel piping with fully controlled valves.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.