Check out these projects too
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of stainless steel piping with fully controlled valves.
- Modification and optimization of existing stainless steel pipes.
- Stainless steel piping installed for product transport.
- Construction of a preparation room with a structure providing access to the roof.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of internal walls to create separate office spaces.
- Construction of a stainless steel fitting, made fully food-safe.
- Realization of a fully finished washing room with sliding panel at the front.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a platform to support a heat curtain and drying unit.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a compressed air collector in galvanized steel.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a spiral duct for extraction via the roof.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of automatic valves that open and close during the filling process.