Check out these projects too
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Realization of a platform that was suspended from an existing structure.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a platform to support a heat curtain and drying unit.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of automatic valves that open and close during the filling process.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Realization of a fully finished washing room with sliding panel at the front.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a stainless steel extraction pipe for dust extraction.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a preparation room with a structure providing access to the roof.
- Project documentation of a renovation, with a before and after view of the building.
- A fixed panel was replaced with a hinged panel for improved accessibility.