Check out these projects too
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of automatic valves that open and close during the filling process.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Modification and optimization of existing stainless steel pipes.
- Construction of a preparation room with a structure providing access to the roof.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Realization of a platform that was suspended from an existing structure.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Design and production of custom-made stainless steel dump hoppers.
- Stainless steel piping installed for product transport.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a stainless steel extraction pipe for dust extraction.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a compressed air collector in galvanized steel.
- Project documentation of a renovation, with a before and after view of the building.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of stainless steel piping with fully controlled valves.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a spiral duct for extraction via the roof.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Realization of a laboratory space constructed from sandwich panels.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.