Check out these projects too
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Modification and optimization of existing stainless steel pipes.
- Design and production of custom-made stainless steel dump hoppers.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of a preparation room with a structure providing access to the roof.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Stainless steel piping installed for product transport.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Execution of floor works in which the floor was adjusted and extended from below.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a compressed air collector in galvanized steel.
- Installation of automatic valves that open and close during the filling process.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of a complex cluster of stainless steel tube connections.