Check out these projects too
- Installation of a stainless steel extraction pipe for dust extraction.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of internal walls to create separate office spaces.
- Project documentation of a renovation, with a before and after view of the building.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and installation of a bridge structure above a moving can conveyor line.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of automatic valves that open and close during the filling process.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Realization of a platform that was suspended from an existing structure.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a compressed air collector in galvanized steel.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of a spiral duct for extraction via the roof.
- Construction of a stainless steel fitting, made fully food-safe.