Check out these projects too
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of a compressed air collector in galvanized steel.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a spiral duct for extraction via the roof.
- Installation of automatic valves that open and close during the filling process.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Design and installation of a bridge structure above a moving can conveyor line.
- Realization of a platform that was suspended from an existing structure.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a stainless steel fitting, made fully food-safe.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Stainless steel piping installed for product transport.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Realization of a laboratory space constructed from sandwich panels.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of stainless steel piping with fully controlled valves.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of internal walls to create separate office spaces.