Check out these projects too
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Stainless steel piping installed for product transport.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a stainless steel fitting, made fully food-safe.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of a compressed air collector in galvanized steel.
- Construction of a platform to support a heat curtain and drying unit.
- Design and production of custom-made stainless steel dump hoppers.
- Realization of a platform that was suspended from an existing structure.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Modification and optimization of existing stainless steel pipes.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of internal walls to create separate office spaces.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of automatic valves that open and close during the filling process.
- Realization of a fully finished washing room with sliding panel at the front.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a stainless steel extraction pipe for dust extraction.
- Project documentation of a renovation, with a before and after view of the building.