Check out these projects too
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Realization of a fully finished washing room with sliding panel at the front.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Modification and optimization of existing stainless steel pipes.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Design and production of custom-made stainless steel dump hoppers.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Execution of floor works in which the floor was adjusted and extended from below.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a complex cluster of stainless steel tube connections.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of internal walls to create separate office spaces.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of a spiral duct for extraction via the roof.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.