Check out these projects too
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design and installation of a bridge structure above a moving can conveyor line.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Installation of automatic valves that open and close during the filling process.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Realization of a fully finished washing room with sliding panel at the front.
- Modification and optimization of existing stainless steel pipes.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a spiral duct for extraction via the roof.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Stainless steel piping installed for product transport.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a compressed air collector in galvanized steel.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Realization of a platform that was suspended from an existing structure.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a complex cluster of stainless steel tube connections.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.