Check out these projects too
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of internal walls to create separate office spaces.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of a spiral duct for extraction via the roof.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a preparation room with a structure providing access to the roof.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a compressed air collector in galvanized steel.
- Installation of stainless steel piping with fully controlled valves.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Execution of floor works in which the floor was adjusted and extended from below.
- Stainless steel piping installed for product transport.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Realization of a fully finished washing room with sliding panel at the front.
- Modification and optimization of existing stainless steel pipes.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.