Check out these projects too
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a complex cluster of stainless steel tube connections.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Realization of a platform that was suspended from an existing structure.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of internal walls to create separate office spaces.
- Construction of a preparation room with a structure providing access to the roof.
- Modification and optimization of existing stainless steel pipes.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of a compressed air collector in galvanized steel.
- Realization of a fully finished washing room with sliding panel at the front.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a stainless steel extraction pipe for dust extraction.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Stainless steel piping installed for product transport.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Design and production of custom-made stainless steel dump hoppers.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.