Check out these projects too
- Installation of automatic valves that open and close during the filling process.
- Realization of a laboratory space constructed from sandwich panels.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a spiral duct for extraction via the roof.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Realization of a platform that was suspended from an existing structure.
- Installation of a compressed air collector in galvanized steel.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a preparation room with a structure providing access to the roof.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Realization of a fully finished washing room with sliding panel at the front.
- Modification and optimization of existing stainless steel pipes.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Execution of floor works in which the floor was adjusted and extended from below.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of a platform to support a heat curtain and drying unit.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a stainless steel extraction pipe for dust extraction.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.