- Execution of floor works in which the floor was adjusted and extended from below.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Realization of a platform that was suspended from an existing structure.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of stainless steel piping with fully controlled valves.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Installation of a stainless steel extraction pipe for dust extraction.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a spiral duct for extraction via the roof.
- Installation of a compressed air collector in galvanized steel.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Construction of a platform to support a heat curtain and drying unit.