Check out these projects too
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of a compressed air collector in galvanized steel.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of internal walls to create separate office spaces.
- Realization of a platform that was suspended from an existing structure.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of stainless steel piping with fully controlled valves.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.