Check out these projects too
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Modification and optimization of existing stainless steel pipes.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of automatic valves that open and close during the filling process.
- Stainless steel piping installed for product transport.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a preparation room with a structure providing access to the roof.
- Design and installation of a bridge structure above a moving can conveyor line.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Realization of a platform that was suspended from an existing structure.
- Construction of a platform to support a heat curtain and drying unit.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.