Check out these projects too
- Installation of a spiral duct for extraction via the roof.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Stainless steel piping installed for product transport.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a stainless steel extraction pipe for dust extraction.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Realization of a platform that was suspended from an existing structure.
- Project documentation of a renovation, with a before and after view of the building.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Installation of stainless steel piping with fully controlled valves.
- Installation of automatic valves that open and close during the filling process.
- Realization of a fully finished washing room with sliding panel at the front.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Modification and optimization of existing stainless steel pipes.
- Realization of a laboratory space constructed from sandwich panels.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Design and installation of a bridge structure above a moving can conveyor line.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design and production of custom-made stainless steel dump hoppers.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.