Check out these projects too
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Realization of a platform that was suspended from an existing structure.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a wall that separates spaces and is provided with windows and doors.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of automatic valves that open and close during the filling process.
- Installation of a complex cluster of stainless steel tube connections.
- Modification and optimization of existing stainless steel pipes.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Realization of a fully finished washing room with sliding panel at the front.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Design and installation of a bridge structure above a moving can conveyor line.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Stainless steel piping installed for product transport.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.