Check out these projects too
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a spiral duct for extraction via the roof.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of a compressed air collector in galvanized steel.
- Installation of internal walls to create separate office spaces.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a stainless steel fitting, made fully food-safe.
- Construction of a preparation room with a structure providing access to the roof.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Modification and optimization of existing stainless steel pipes.
- Design and production of custom-made stainless steel dump hoppers.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Construction of a platform to support a heat curtain and drying unit.
- Installation of automatic valves that open and close during the filling process.
- Stainless steel piping installed for product transport.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Realization of a platform that was suspended from an existing structure.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.