Check out these projects too
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of a spiral duct for extraction via the roof.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Design and production of custom-made stainless steel dump hoppers.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Construction of a preparation room with a structure providing access to the roof.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Execution of floor works in which the floor was adjusted and extended from below.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Stainless steel piping installed for product transport.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a stainless steel extraction pipe for dust extraction.
- Installation of stainless steel piping with fully controlled valves.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Construction of a platform to support a heat curtain and drying unit.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of automatic valves that open and close during the filling process.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.