Check out these projects too
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a complex cluster of stainless steel tube connections.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Construction of a platform to support a heat curtain and drying unit.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Installation of a stainless steel extraction pipe for dust extraction.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of a spiral duct for extraction via the roof.
- Construction of a stainless steel fitting, made fully food-safe.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Execution of floor works in which the floor was adjusted and extended from below.
- Stainless steel piping installed for product transport.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Installation of sound and heat shielding around pumps to reduce nuisance.