Check out these projects too
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Execution of floor works in which the floor was adjusted and extended from below.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of a complex cluster of stainless steel tube connections.
- Construction of a canopy on an existing building with two sliding doors over a length of approximately 24 meters.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Installation of a spiral duct for extraction via the roof.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Installation of stainless steel piping with fully controlled valves.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Installation of automatic valves that open and close during the filling process.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Installation of a compressed air collector in galvanized steel.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Modification and optimization of existing stainless steel pipes.
- Construction of a platform to support a heat curtain and drying unit.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- A fixed panel was replaced with a hinged panel for improved accessibility.
- Realization of a platform that was suspended from an existing structure.
- Installation of a stainless steel extraction pipe for dust extraction.
- Adjustment of guides with a smoothly adjustable system based on the package size.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of internal walls to create separate office spaces.
- Design and production of custom-made stainless steel dump hoppers.
- Realization of a fully finished washing room with sliding panel at the front.
- Galvanized pipe from exhaust to filter for the discharge of harmful industrial gases.