Check out these projects too
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Construction of a preparation room with a structure providing access to the roof.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Design and production of custom-made stainless steel dump hoppers.
- Complete project including steel structure, sandwich panels, windows, doors, and folding ladder — fully executed by AS Mechanics.
- Project documentation of a renovation, with a before and after view of the building.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Stainless steel piping installed for product transport.
- Installation of internal walls to create separate office spaces.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of a stainless steel extraction pipe for dust extraction.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of a complex cluster of stainless steel tube connections.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Design and installation of a bridge structure above a moving can conveyor line.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Installation of stainless steel piping with fully controlled valves.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Construction of a custom-made machine platform for maintenance access at a French production site.