Check out these projects too
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Development of a vestibule mechanism to reduce wind and draught problems at frequently opened gates.
- Construction of a platform to support a heat curtain and drying unit.
- Construction of a preparation room with a structure providing access to the roof.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of automatic valves that open and close during the filling process.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Installation of a stainless steel extraction pipe for dust extraction.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a complex cluster of stainless steel tube connections.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of internal walls to create separate office spaces.
- Execution of crane work for the installation of fan, collector and filter systems on the roof.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Installation of stainless steel pipes at a height of approximately 25 meters.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Stainless steel piping installed for product transport.
- Design and construction of a steel structure with extensive glass panels, completely suspended from the ceiling without floor supports.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of a spiral duct for extraction via the roof.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Realization of a platform that was suspended from an existing structure.
- A full steel canopy was built against an existing building to cover the loading and unloading docks.
- Modification and optimization of existing stainless steel pipes.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.