Check out these projects too
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Construction of floating platforms prior to installation of the production line, in accordance with the EN1090 standard, fully customized and adapted to future transport systems.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- Installation of a Jacob Tube System for production extraction, without welding, with clamp connections.
- Realization of a platform that was suspended from an existing structure.
- Construction of a preparation area within a production hall, constructed with a steel support structure and sandwich panels, custom-made for the customer.
- Construction of a stainless steel fitting, made fully food-safe.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of a stainless steel extraction pipe for dust extraction.
- Realization of a laboratory space constructed from sandwich panels.
- Installation of internal walls to create separate office spaces.
- AS Mechanics built an aluminum frame in which the labeling machine was fully integrated.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a complex cluster of stainless steel tube connections.
- Fully enclosed PVC sheet cabinet designed to block harmful laser beams.
- Modification and optimization of existing stainless steel pipes.
- AS Mechanics developed custom-made grilles around cooling units on behalf of the architect, as an aesthetic solution to nuisance to the neighbors.
- Construction of a wall that separates spaces and is provided with windows and doors.
- Installation of automatic valves that open and close during the filling process.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Opening and construction of a tower structure to allow machines to be moved from the factory floor; permanently accessible for installation and removal.
- Design and production of custom-made stainless steel dump hoppers.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Realization of a fully finished washing room with sliding panel at the front.
- Stainless steel piping installed for product transport.