Check out these projects too
- Realization of a fully finished washing room with sliding panel at the front.
- Installation of sound and heat shielding around pumps to reduce nuisance.
- Construction of a hopper to pump product more efficiently via an existing transfer pump.
- Installation of a complex cluster of stainless steel tube connections.
- Design of pipelines with large radius bends for minimal resistance during granulate transport.
- Installation of stainless steel return and forward pipes for cooling injection moulding machines.
- Modification of a maintenance-intensive installation to contain harmful powders, while maintaining full accessibility for maintenance.
- Installation of a wall made of sandwich panels with a custom-made sliding gate.
- Construction of a stainless steel fitting, made fully food-safe.
- Installation of a compressed air collector in galvanized steel.
- Installation of a stainless steel extraction pipe for dust extraction.
- Realization of a platform that was suspended from an existing structure.
- Division of an existing hall using a wall of sandwich panels with an integrated high-speed door.
- AS Mechanics installed an aluminum shield that completely blocks out dust, while the area remains easily accessible.
- Realisation of a stainless steel supporting structure from which piping and machines were suspended.
- Installation of a partially reclaimed room with sliding doors from Asebloi as a budget-friendly solution.
- Design and construction of a custom-made sliding gate with a clear passage of 12 meters.
- Installation of a spiral duct for extraction via the roof.
- Installation of internal walls to create separate office spaces.
- Installation of automatic valves that open and close during the filling process.
- Design and construction of a fully customised steel platform for machine access in an existing installation, in accordance with EN1090 certification.
- Construction of a canopy above the spray-off room where funnels can be sprayed off.
- Construction of a custom-made machine platform for maintenance access at a French production site.
- Fully prepared stainless steel skid, built in our own workshop and installed as a plug & play system.
- Design and installation of a bridge structure above a moving can conveyor line.
- Installation of a Hörmann steel door in an existing wall, including window and base plate – fast service.
- Manufacturing of new hopper and intermediate pieces, perfectly fitting on the existing conveyor worm.
- Installation of an extraction system with cabinets that efficiently extract powder released during measurements.
- Installation of stainless steel piping with fully controlled valves.
- Project documentation of a renovation, with a before and after view of the building.
- Installation of railings and a wall with a custom window in an office building with industrial furnishings.
- Construction of a platform to support a heat curtain and drying unit.
- Dump pot variant: powder is poured into the big bag and flows through a funnel.
- Modification and optimization of existing stainless steel pipes.
- Design and production of custom-made stainless steel dump hoppers.